Curated reference and analysis. Last full review: June 17, 2026
Verify all figures against ISO sources before relying on them for project decisions.
← Overview
Exhibit 2 · Project signal

Stargate / Abilene (Lancium Clean Campus)

Data Center · Under Construction
ISO/RTO:ERCOTConfidence:High
Status
Under Construction
State
TX
County
Taylor
Nearest city
Abilene
Utility
Oncor / ERCOT
Developer / owner
Crusoe (developer); Oracle lease for OpenAI; Stargate JV (OpenAI, Oracle, SoftBank)
Estimated load
1,200 MW
Estimated generation
Not disclosed
Reported capex (as cited)
~$15B reported (most expensive U.S. data center project financed to date, per Bloomberg)
Announced
2025-01
Expected COD
Phased; two buildings operational since Sept 2025, remaining six targeted mid-2026
Public summary
Flagship Stargate campus on Lancium's Clean Campus, ~1,000-1,100 acres, eight buildings, ~1.2 GW at full build. First Stargate site to go live. A planned expansion toward ~2 GW was canceled in March 2026 over financing and shifting demand forecasts; Nvidia paid a $150M deposit to secure the surplus capacity and approached Meta as a replacement tenant. Power configuration: on-site gas peaking plus grid; the campus is designed around curtailed and under-used ERCOT generation.
Grid relevance
Largest operational AI campus in ERCOT and the clearest example of power availability — not capital — capping data-center scale. Built around using curtailed/under-utilized ERCOT generation. The canceled expansion shows grid delay as the binding constraint on gigawatt-scale growth.
Last updated